Solar + storage project 2017-G2, Contra Costa County

Solar + storage project 2017-G2, Contra Costa County is a 100 MW solar + storage request withdrawn in the West interconnection queue, in Contra Costa County, California, connecting to WAPA Sierra Nevada.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2017 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
2017-G2
Grid region
West (non-ISO utilities)
Utility / transmission owner
WAPA Sierra Nevada
Connection point (POI)
Tracy 69 kV Substation
Location
Contra Costa County, California
Technology
Solar: 100 MW Β· Battery
Total requested
100 MW
Study phase
Withdrawn due to lack of available customer funding to perform FS.
Queue status
Withdrawn
Entered queue
19 September 2017
Proposed online date
December 2021

Location

Marker shows the centre of Contra Costa County; the queue data does not give exact sites.

Power plants in California Β· Transmission lines in California

Other requests in Contra Costa County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem