United States β€Ί Grid β€Ί Interconnection queues β€Ί Louisiana

OTHER Β· MISO

Other project J2373, Calcasieu Parish County

Other project J2373, Calcasieu Parish County is a 40.0 MW other request withdrawn in the MISO interconnection queue, in Calcasieu Parish County, Louisiana, connecting to ENTERGY LOUISIANA.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2022 (completed)
  2. Withdrawn / abandonedJan 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J2373
Grid region
MISO (Midcontinent)
Utility / transmission owner
ENTERGY LOUISIANA
Connection point (POI)
230kV Graywood or (new) Big Lake
Location
Calcasieu Parish County, Louisiana
Technology
Other: 40.0 MW
Total requested
40.0 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: DPP 2; Post GIA Status: Not Started
Queue status
Withdrawn
Entered queue
15 September 2022
Proposed online date
January 2025
Withdrawn
January 2023

Location

Marker shows the centre of Calcasieu Parish County; the queue data does not give exact sites.