BATTERY STORAGE Β· MISO

Battery storage project J522, Mower County

Battery storage project J522, Mower County is a 20.0 MW battery storage request withdrawn in the MISO interconnection queue, in Mower County, Minnesota, connecting to ITC MIDWEST.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2015 (completed)
  2. Withdrawn / abandonedApr 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J522
Grid region
MISO (Midcontinent)
Utility / transmission owner
ITC MIDWEST
Connection point (POI)
Adams substation at 69 kV
Location
Mower County, Minnesota
Technology
Battery: 20.0 MW
Total requested
20.0 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: GIA; Post GIA Status: Not Started
Queue status
Withdrawn
Entered queue
16 November 2015
Proposed online date
September 2019
Withdrawn
April 2019

Location

Marker shows the centre of Mower County; the queue data does not give exact sites.