United States β€Ί Grid β€Ί Interconnection queues β€Ί Maine

ONSHORE WIND Β· ISO-NE

Wind

Wind is a 197 MW onshore wind request withdrawn in the ISO-NE interconnection queue, in Aroostook County, Maine.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2024 (completed)
  2. Withdrawn / abandonedOct 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1566
Grid region
ISO-NE (New England)
Connection point (POI)
Orrington β€šΓ„Γ¬ Albion Road 345kV
Location
Aroostook County, Maine
Technology
Wind: 197 MW
Total requested
197 MW
Service type
Network resource (NRIS)
Queue status
Withdrawn
Entered queue
11 June 2024
Proposed online date
October 2028
Withdrawn
October 2025

Location

Marker shows the centre of Aroostook County; the queue data does not give exact sites.

Power plants in Maine Β· Transmission lines in Maine

Other requests in Aroostook County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem