Onshore wind project G801, Mower County

Onshore wind project G801, Mower County is a 50.0 MW onshore wind request withdrawn in the MISO interconnection queue, in Mower County, Minnesota.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2007 (completed)
  2. Withdrawn / abandonedDec 2010 (project stopped here)
  3. ConsentedDec 2010 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G801
Grid region
MISO (Midcontinent)
Connection point (POI)
161 kV GRE line in southwest 1/4 of section 26 Waltham Twp
Location
Mower County, Minnesota
Technology
Wind: 50.0 MW
Total requested
50.0 MW
Study phase
SPA - SIS
Queue status
Withdrawn
Entered queue
24 May 2007
Agreement signed
28 December 2010
Proposed online date
November 2009
Withdrawn
December 2010

Location

Marker shows the centre of Mower County; the queue data does not give exact sites.

Power plants in Minnesota Β· Transmission lines in Minnesota

Other requests in Mower County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem