United States β€Ί Grid β€Ί Interconnection queues β€Ί Louisiana

SOLAR Β· MISO

Solar project J518, Calcasieu Parish County

Solar project J518, Calcasieu Parish County is a 49.5 MW solar request withdrawn in the MISO interconnection queue, in Calcasieu Parish County, Louisiana.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2015 (completed)
  2. Withdrawn / abandonedMar 2017 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J518
Grid region
MISO (Midcontinent)
Connection point (POI)
tapping on Lake Charles -Jennings 138 kV line
Location
Calcasieu Parish County, Louisiana
Technology
Solar: 49.5 MW
Total requested
49.5 MW
Study phase
GIA
Queue status
Withdrawn
Entered queue
16 November 2015
Proposed online date
November 2017
Withdrawn
March 2017

Location

Marker shows the centre of Calcasieu Parish County; the queue data does not give exact sites.

Power plants in Louisiana Β· Transmission lines in Louisiana

Other requests in Calcasieu Parish County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem