United States βΊ Grid βΊ Interconnection queues βΊ Iowa
ONSHORE WIND Β· MISOOnshore wind project J298, Tama County
Onshore wind project J298, Tama County is a 300 MW onshore wind request withdrawn in the MISO interconnection queue, in Tama County, Iowa.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2013 (completed)
- Withdrawn / abandonedOct 2017 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J298
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- ITCM Dysart 161 kV Substation
- Location
- Tama County, Iowa
- Technology
- Wind: 300 MW
- Total requested
- 300 MW
- Study phase
- DPP - SIS
- Queue status
- Withdrawn
- Entered queue
- 13 November 2013
- Proposed online date
- September 2016
- Withdrawn
- October 2017
Location
Marker shows the centre of Tama County; the queue data does not give exact sites.
Other requests in Tama County
- Onshore wind project J1365, Tama CountyOnshore wind Β· 169 MW Β· in study
- Onshore wind project J2031, Tama CountyOnshore wind Β· 100 MW Β· in study
- Onshore wind project H009, Tama CountyOnshore wind Β· 150 MW Β· built
- Other project G286, Tama CountyOther Β· 4.0 MW Β· built
- Onshore wind project J461, Tama CountyOnshore wind Β· 299 MW Β· withdrawn
- Battery storage project J2095, Tama CountyBattery storage Β· 212 MW Β· withdrawn
- Solar project J3462, Tama CountySolar Β· 187 MW Β· withdrawn
- Onshore wind project J096, Tama CountyOnshore wind Β· 150 MW Β· withdrawn
- Onshore wind project J114, Tama CountyOnshore wind Β· 150 MW Β· withdrawn
- Onshore wind project H039, Tama CountyOnshore wind Β· 71.0 MW Β· withdrawn
- Onshore wind project J3544, Tama CountyOnshore wind Β· 62.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem