United States β€Ί Grid β€Ί Interconnection queues β€Ί Iowa

SOLAR Β· MISO

Solar project J3462, Tama County

Solar project J3462, Tama County is a 187 MW solar request withdrawn in the MISO interconnection queue, in Tama County, Iowa, connecting to ITC MIDWEST.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2024 (completed)
  2. Withdrawn / abandonedJun 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J3462
Grid region
MISO (Midcontinent)
Utility / transmission owner
ITC MIDWEST
Connection point (POI)
Dysart - Traer 161kV
Location
Tama County, Iowa
Technology
Solar: 187 MW
Total requested
187 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: DPP 1
Queue status
Withdrawn
Entered queue
17 April 2024
Proposed online date
May 2028
Withdrawn
June 2025

Location

Marker shows the centre of Tama County; the queue data does not give exact sites.

Power plants in Iowa Β· Transmission lines in Iowa

Other requests in Tama County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem