United States β€Ί Grid β€Ί Interconnection queues β€Ί Iowa

ONSHORE WIND Β· MISO

Onshore wind project J461, Tama County

Onshore wind project J461, Tama County is a 299 MW onshore wind request withdrawn in the MISO interconnection queue, in Tama County, Iowa.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2015 (completed)
  2. Withdrawn / abandonedNov 2016 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J461
Grid region
MISO (Midcontinent)
Connection point (POI)
Unknown
Location
Tama County, Iowa
Technology
Wind: 299 MW
Total requested
299 MW
Study phase
Feasibility
Queue status
Withdrawn
Entered queue
18 May 2015
Proposed online date
September 2016
Withdrawn
November 2016

Location

Marker shows the centre of Tama County; the queue data does not give exact sites.

Power plants in Iowa Β· Transmission lines in Iowa

Other requests in Tama County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem