BATTERY STORAGE · CAISO

Pinto Pass

Pinto Pass is a 20.0 MW battery storage request withdrawn in the CAISO interconnection queue, in Contra Costa County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2018 (completed)
  2. Withdrawn / abandonedSep 2022 (project stopped here)
  3. ConsentedOct 2020 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1460
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Christie Substation 60kV
Location
Contra Costa County, California
Technology
Battery: 20.0 MW
Total requested
20.0 MW
Service type
Network resource (NRIS)
Study phase
Executed
Queue status
Withdrawn
Entered queue
16 April 2018
Agreement signed
1 October 2020
Proposed online date
December 2023
Withdrawn
September 2022

Location

Marker shows the centre of Contra Costa County; the queue data does not give exact sites.