United States βΊ Grid βΊ Interconnection queues βΊ North Dakota
ONSHORE WIND Β· WESTOnshore wind project GI-0112, Dickey County
Onshore wind project GI-0112, Dickey County is a 300 MW onshore wind request withdrawn in the West interconnection queue, in Dickey County, North Dakota, connecting to WAPA/BEPC/HCPD Integrated System.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2001 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GI-0112
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- WAPA/BEPC/HCPD Integrated System
- Connection point (POI)
- Dickey County
- Location
- Dickey County, North Dakota
- Technology
- Wind: 300 MW
- Total requested
- 300 MW
- Study phase
- IAP
- Queue status
- Withdrawn
- Entered queue
- 10 September 2001
Location
Marker shows the centre of Dickey County; the queue data does not give exact sites.
Power plants in North Dakota Β· Transmission lines in North Dakota
Other requests in Dickey County
- Onshore wind project J3280, Dickey CountyOnshore wind Β· 300 MW Β· in study
- Onshore wind project G132, Dickey CountyOnshore wind Β· 180 MW Β· built
- Onshore wind project J249, Dickey CountyOnshore wind Β· 180 MW Β· built
- Onshore wind project G359R, Dickey CountyOnshore wind Β· 150 MW Β· built
- Onshore wind project J316, Dickey CountyOnshore wind Β· 150 MW Β· built
- Onshore wind project G853, Dickey CountyOnshore wind Β· 600 MW Β· withdrawn
- Gas project J509, Dickey CountyGas Β· 327 MW Β· withdrawn
- Onshore wind project G690, Dickey CountyOnshore wind Β· 200 MW Β· withdrawn
- Onshore wind project J3667, Dickey CountyOnshore wind Β· 200 MW Β· withdrawn
- Onshore wind project G713, Dickey CountyOnshore wind Β· 200 MW Β· withdrawn
- Onshore wind project G221, Dickey CountyOnshore wind Β· 180 MW Β· withdrawn
- Onshore wind project G359, Dickey CountyOnshore wind Β· 150 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem