πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

OTHER Β· ERCOT

Moonshine Hill BESS

Moonshine Hill BESS is a 201 MW other request withdrawn in the ERCOT interconnection queue, in Harris County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2022 (completed)
  2. Withdrawn / abandonedNov 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
24INR0435
Grid region
ERCOT (Texas)
Developer
Black Mountain Energy Storage II
Connection point (POI)
138kV HUMBLE_B138 40830
Location
Harris County, Texas
Technology
Other: 201 MW
Total requested
201 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
20 September 2022
Proposed online date
August 2024
Withdrawn
November 2023

Location

Marker shows the centre of Harris County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Harris County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem