United States β€Ί Grid β€Ί Interconnection queues β€Ί Minnesota

ONSHORE WIND Β· MISO

Onshore wind project J216, Mower County

Onshore wind project J216, Mower County is a 25.0 MW onshore wind request withdrawn in the MISO interconnection queue, in Mower County, Minnesota.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2011 (completed)
  2. Withdrawn / abandonedApr 2012 (project stopped here)
  3. ConsentedApr 2012 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J216
Grid region
MISO (Midcontinent)
Connection point (POI)
Austin Northeast 69 kV Substation
Location
Mower County, Minnesota
Technology
Wind: 25.0 MW
Total requested
25.0 MW
Study phase
SPA - SIS
Queue status
Withdrawn
Entered queue
24 June 2011
Agreement signed
20 April 2012
Proposed online date
June 2013
Withdrawn
April 2012

Location

Marker shows the centre of Mower County; the queue data does not give exact sites.

Power plants in Minnesota Β· Transmission lines in Minnesota

Other requests in Mower County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem