United States › Grid › Interconnection queues › Texas
ONSHORE WIND · ERCOTReloj Del Sol Wind
Reloj Del Sol Wind is a 209 MW onshore wind request built and operating in the ERCOT interconnection queue, in Zapata County, Texas.
Request details
- Queue ID
- 17INR0025
- Grid region
- ERCOT (Texas)
- Developer
- EDP Renewables
- Connection point (POI)
- 80220 Cenizo 345kV
- Location
- Zapata County, Texas
- Technology
- Wind: 209 MW
- Total requested
- 209 MW
- Study phase
- IA
- Queue status
- Operational
- Entered queue
- 23 March 2015
- Agreement signed
- 21 December 2018
- Proposed online date
- July 2022
- Came online
- August 2022
Location
Marker shows the centre of Zapata County; the queue data does not give exact sites.
Other requests in Zapata County
- Cascabel Wind 2Onshore wind · 198 MW · agreement signed
- Cascabel Wind 1Onshore wind · 198 MW · agreement signed
- Corralitos Wind 1Onshore wind · 196 MW · agreement signed
- Corralitos Wind 2Onshore wind · 195 MW · agreement signed
- Falcon BESSBattery storage · 517 MW · in study
- Freedom Falcon BESSBattery storage · 502 MW · in study
- Vaquero 1 WindOnshore wind · 400 MW · in study
- Tetris SolarSolar · 359 MW · in study
- Sierra Madre SolarSolar · 255 MW · in study
- Zelus BESSBattery storage · 201 MW · in study
- Falcon Zapata Storage 138Battery storage · 201 MW · in study
- Barrosos Creek Wind 3Onshore wind · 198 MW · in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem