United States βΊ Grid βΊ Interconnection queues βΊ Florida
SOLAR Β· SOUTHEASTOsceola Solar 2
Osceola Solar 2 is a 74.5 MW solar request withdrawn in the Southeast interconnection queue, in Osceola County, Florida, connecting to Orlando Utilities Commission.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2017 (completed)
- Withdrawn / abandonedJul 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 201702
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Orlando Utilities Commission
- Connection point (POI)
- St Cloud East - Holopaw 230 kV
- Location
- Osceola County, Florida
- Technology
- Solar: 74.5 MW
- Total requested
- 74.5 MW
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 7 November 2017
- Withdrawn
- July 2023
Location
Marker shows the centre of Osceola County; the queue data does not give exact sites.
Other requests in Osceola County
- Solar project 326, Osceola CountySolar Β· 74.9 MW Β· under construction
- Solar project 325, Osceola CountySolar Β· 74.9 MW Β· under construction
- Bull Creek (Osceola Generating Station)Gas Β· 555 MW Β· agreement signed
- Gas project 4, Osceola CountyGas Β· 537 MW Β· in study
- Gas project FC100382, Osceola CountyGas Β· 265 MW Β· in study
- Gas project FC100386, Osceola CountyGas Β· 265 MW Β· in study
- Storey Bend SouthSolar Β· 74.5 MW Β· in study
- Storey BendSolar Β· 74.5 MW Β· in study
- Harmony 2Solar Β· 74.5 MW Β· in study
- Gas project 72, Osceola CountyGas Β· 340 MW Β· built
- Gas project 74, Osceola CountyGas Β· 170 MW Β· built
- Holopaw HarmonySolar Β· 74.5 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem