United States βΊ Grid βΊ Interconnection queues βΊ Texas
GAS Β· ERCOTFGE Texas 1 Gas
FGE Texas 1 Gas is a 743 MW gas request withdrawn in the ERCOT interconnection queue, in Mitchell County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2013 (completed)
- Withdrawn / abandonedAug 2019 (project stopped here)
- ConsentedAug 2016 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 16INR0010
- Grid region
- ERCOT (Texas)
- Developer
- FGE Power
- Connection point (POI)
- Tap 345kV 1030 Morgan - 1025 Falcon
- Location
- Mitchell County, Texas
- Technology
- Gas: 743 MW
- Total requested
- 743 MW
- Study phase
- IA and FIS Pending
- Queue status
- Withdrawn
- Entered queue
- 23 April 2013
- Agreement signed
- 31 August 2016
- Proposed online date
- April 2021
- Withdrawn
- August 2019
Location
Marker shows the centre of Mitchell County; the queue data does not give exact sites.
Other requests in Mitchell County
- Hackberry Creek SolarSolar Β· 176 MW Β· agreement signed
- Zeus Mitchell BESS IISolar + storage Β· 1,043 MW Β· in study
- Zeus Mitchell BESSSolar + storage Β· 1,043 MW Β· in study
- Zeus Spade WindWind + storage Β· 987 MW Β· in study
- Zeus Mitchell SolarSolar + storage Β· 805 MW Β· in study
- River Boat SolarSolar + storage Β· 502 MW Β· in study
- Zeus Spade BESSWind + storage Β· 446 MW Β· in study
- Rabbit Hollow Energy StorageBattery storage Β· 342 MW Β· in study
- River Boat Power Gas PlantGas Β· 334 MW Β· in study
- Prairie Power WindOnshore wind Β· 303 MW Β· in study
- River Boat StorageSolar + storage Β· 207 MW Β· in study
- Sunflower Valley StorageBattery storage Β· 206 MW Β· in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem