United States › Grid › Interconnection queues › Maine
SOLAR + STORAGE · ISO-NESolar plus Battery
Solar plus Battery is a 205 MW solar + storage request withdrawn in the ISO-NE interconnection queue, in Aroostook County, Maine.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2022 (completed)
- Withdrawn / abandonedAug 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1295
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- Orrington-Albion Rd 345kV line (3023) near the town of Pittsfield (approximately 19 miles from Albion Rd Substation)
- Location
- Aroostook County, Maine
- Technology
- Solar: 205 MW · Battery
- Total requested
- 205 MW
- Service type
- Network resource (NRIS)
- Queue status
- Withdrawn
- Entered queue
- 9 August 2022
- Proposed online date
- November 2025
- Withdrawn
- August 2024
Location
Marker shows the centre of Aroostook County; the queue data does not give exact sites.
Other requests in Aroostook County
- Oakfield II Wind - Keene RoadOnshore wind · 136 MW · built
- WindOnshore wind · 905 MW · withdrawn
- WindOnshore wind · 630 MW · withdrawn
- WindOnshore wind · 601 MW · withdrawn
- WindOnshore wind · 601 MW · withdrawn
- WindOnshore wind · 601 MW · withdrawn
- WindOnshore wind · 601 MW · withdrawn
- WindOnshore wind · 500 MW · withdrawn
- WindOnshore wind · 500 MW · withdrawn
- WindOnshore wind · 376 MW · withdrawn
- SolarSolar · 319 MW · withdrawn
- SolarSolar · 300 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem