Onshore wind project GEN-2010-049, Pratt County

Onshore wind project GEN-2010-049, Pratt County is a 49.6 MW onshore wind request withdrawn in the SPP interconnection queue, in Pratt County, Kansas, connecting to MKEC.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2010 (completed)
  2. Withdrawn / abandonedMar 2012 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2010-049
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
MKEC
Connection point (POI)
Pratt 115kV
Location
Pratt County, Kansas
Technology
Wind: 49.6 MW
Total requested
49.6 MW
Service type
Energy only (ERIS)
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
30 September 2010
Proposed online date
September 2012
Withdrawn
March 2012

Location

Marker shows the centre of Pratt County; the queue data does not give exact sites.