United States › Grid › Interconnection queues › Texas

BATTERY STORAGE · ERCOT

Little York BESS

Little York BESS is a 10.0 MW battery storage request with a signed interconnection agreement in the ERCOT interconnection queue, in Harris County, Texas.

Queue statusConsented
  1. Planning (completed)
  2. ConsentedAug 2025 (current stage)
  3. Construction (not yet reached)
  4. OperatingTarget Apr 2026 (not yet reached)
  5. Closed (not yet reached)

Request details

Queue ID
24INR0481
Grid region
ERCOT (Texas)
Developer
ESTX-PLD-HOUSTON5, LLC
Connection point (POI)
Station Name (TDSP Station Code): Little York (LK) Load/Load Transformer Name: TR3 PTI BUS number: 45995 Voltage in kV (Transmission Level): 138kV Node (associated w/ load/load XFMR in NMMS): TR3
Location
Harris County, Texas
Technology
Battery: 10.0 MW
Total requested
10.0 MW
Study phase
IA Executed
Queue status
Active
Agreement signed
20 August 2025
Proposed online date
April 2026

Location

Marker shows the centre of Harris County; the queue data does not give exact sites.

Power plants in Texas · Transmission lines in Texas

Other requests in Harris County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem