πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

ONSHORE WIND Β· SPP

Onshore wind project GEN-2014-010, Deaf Smith County

Onshore wind project GEN-2014-010, Deaf Smith County is a 130 MW onshore wind request withdrawn in the SPP interconnection queue, in Deaf Smith County, Texas, connecting to SPS.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2014 (completed)
  2. Withdrawn / abandonedOct 2014 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2014-010
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
SPS
Connection point (POI)
Deaf Smith 115kV
Location
Deaf Smith County, Texas
Technology
Wind: 130 MW
Total requested
130 MW
Service type
NRIS and ERIS
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
31 March 2014
Proposed online date
December 2016
Withdrawn
October 2014

Location

Marker shows the centre of Deaf Smith County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Deaf Smith County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem