Onshore wind project GI-1308, Ward County

Onshore wind project GI-1308, Ward County is a 120 MW onshore wind request withdrawn in the West interconnection queue, in Ward County, North Dakota, connecting to WAPA/BEPC/HCPD Integrated System.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2013 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GI-1308
Grid region
West (non-ISO utilities)
Utility / transmission owner
WAPA/BEPC/HCPD Integrated System
Connection point (POI)
Blaisdell-Berthold 115-kV
Location
Ward County, North Dakota
Technology
Wind: 120 MW
Total requested
120 MW
Service type
Energy only (ERIS)
Study phase
IAP
Queue status
Withdrawn
Entered queue
12 July 2013
Proposed online date
January 2015

Location

Marker shows the centre of Ward County; the queue data does not give exact sites.