πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί North Dakota

ONSHORE WIND Β· MISO

Onshore wind project G659, Oliver County

Onshore wind project G659, Oliver County is a 50.0 MW onshore wind request withdrawn in the MISO interconnection queue, in Oliver County, North Dakota.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2006 (completed)
  2. Withdrawn / abandonedMay 2007 (project stopped here)
  3. ConsentedMay 2007 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G659
Grid region
MISO (Midcontinent)
Connection point (POI)
Center 230 kV Substation
Location
Oliver County, North Dakota
Technology
Wind: 50.0 MW
Total requested
50.0 MW
Study phase
Feasibility
Queue status
Withdrawn
Entered queue
17 July 2006
Agreement signed
24 May 2007
Proposed online date
January 2008
Withdrawn
May 2007

Location

Marker shows the centre of Oliver County; the queue data does not give exact sites.

Power plants in North Dakota Β· Transmission lines in North Dakota

Other requests in Oliver County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem