πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

SOLAR Β· ERCOT

Nightingale Solar

Nightingale Solar is a 152 MW solar request withdrawn in the ERCOT interconnection queue, in Mitchell County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2019 (completed)
  2. Withdrawn / abandonedApr 2021 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
21INR0270
Grid region
ERCOT (Texas)
Developer
ABEI ENERGY
Connection point (POI)
1189 Barber 138kV
Location
Mitchell County, Texas
Technology
Solar: 152 MW
Total requested
152 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
25 March 2019
Proposed online date
March 2022
Withdrawn
April 2021

Location

Marker shows the centre of Mitchell County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Mitchell County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem