Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Other project J1490, Randolph County Other |
1,000 MW | Agreement signed |
| Other project Company KD, White Pine County Other |
750 MW | Paused / redesign |
| Other project J1488, Randolph County Other |
500 MW | Agreement signed |
| San Bernard Storage Other Β· San Bernard Storage, LLC |
101 MW | Paused / redesign |
| Tokyo TxHSR TPSS EW-1 Other Β· Texas Central Rail Holdings, LLC |
50.0 MW | In study |
| Atlanta TxHSR TPSS DS-1 Other Β· Texas Central Rail Holdings, LLC |
50.0 MW | In study |
| Barcelona TxHSR TPSS HN-4 Other Β· Texas Central Rail Holdings, LLC |
50.0 MW | In study |
| Turin TxHSR TPSS HN-6 Other Β· Texas Central Rail Holdings, LLC |
50.0 MW | In study |
| Knickerbocker Storage Other Β· Knickerbocker Solar LLC |
25.0 MW | Paused / redesign |
| Other project J1247, St. Mary Parish County Other |
17.0 MW | Under construction |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)