πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Wisconsin

OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in Wisconsin (2019 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown7577 MW
Active in queue1,393 MW10 requests
Agreement signed793 MW7 requests
Withdrawn7577 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

7 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Solar project J1474, Chippewa County
Solar
200 MWWithdrawn / abandoned Chippewa, WIMISO Apr 2019target 2025
Onshore wind project J1366, Eau Claire County
Onshore wind
200 MWWithdrawn / abandoned Eau Claire, WIMISO Apr 2019target 2022
Solar project J1253, Fond Du Lac County
Solar
100 MWWithdrawn / abandoned Fond Du Lac, WIMISO Apr 2019target 2024
Battery storage project J1345, Dodge County
Battery storage
25.0 MWWithdrawn / abandoned Dodge, WIMISO Apr 2019target 2021
Solar project J1397, Juneau County
Solar
25.0 MWWithdrawn / abandoned Juneau, WIMISO Apr 2019target 2022
Battery storage project J1429, Juneau County
Battery storage
24.0 MWWithdrawn / abandoned Juneau, WIMISO Apr 2019target 2022
Battery storage project J1486, Waupaca County
Battery storage
2.5 MWWithdrawn / abandoned Waupaca, WIMISO Apr 2019target 2021

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)