BATTERY STORAGE Β· MISO

Battery storage project J1429, Juneau County

Battery storage project J1429, Juneau County is a 24.0 MW battery storage request withdrawn in the MISO interconnection queue, in Juneau County, Wisconsin, connecting to DAIRYLAND POWER COOPERATIVE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2019 (completed)
  2. Withdrawn / abandonedMay 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J1429
Grid region
MISO (Midcontinent)
Utility / transmission owner
DAIRYLAND POWER COOPERATIVE
Connection point (POI)
Whistiling Wings 69 kV Substation
Location
Juneau County, Wisconsin
Technology
Battery: 24.0 MW
Total requested
24.0 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: GIA; Post GIA Status: Not Started
Queue status
Withdrawn
Entered queue
29 April 2019
Proposed online date
October 2022
Withdrawn
May 2020

Location

Marker shows the centre of Juneau County; the queue data does not give exact sites.