SOLAR Β· MISOSolar project J1397, Juneau County
Solar project J1397, Juneau County is a 25.0 MW solar request withdrawn in the MISO interconnection queue, in Juneau County, Wisconsin, connecting to DAIRYLAND POWER COOPERATIVE.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2019 (completed)
- Withdrawn / abandonedMay 2020 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J1397
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- DAIRYLAND POWER COOPERATIVE
- Connection point (POI)
- Whistling Wings 69 kV Substation
- Location
- Juneau County, Wisconsin
- Technology
- Solar: 25.0 MW
- Total requested
- 25.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 29 April 2019
- Proposed online date
- October 2022
- Withdrawn
- May 2020
Location
Marker shows the centre of Juneau County; the queue data does not give exact sites.
Power plants in Wisconsin Β· Transmission lines in Wisconsin
Other requests in Juneau County
- Solar project J1502, Juneau CountySolar Β· 225 MW Β· agreement signed
- Battery storage project J3402, Juneau CountyBattery storage Β· 200 MW Β· in study
- Gas project G148, Juneau CountyGas Β· 20.0 MW Β· built
- Other project G115, Juneau CountyOther Β· 100 MW Β· withdrawn
- Other project G114, Juneau CountyOther Β· 60.0 MW Β· withdrawn
- Battery storage project J1429, Juneau CountyBattery storage Β· 24.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem