BATTERY STORAGE Β· MISO

Battery storage project J1486, Waupaca County

Battery storage project J1486, Waupaca County is a 2.5 MW battery storage request withdrawn in the MISO interconnection queue, in Waupaca County, Wisconsin, connecting to American Transmission Co..

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2019 (completed)
  2. Withdrawn / abandonedMar 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J1486
Grid region
MISO (Midcontinent)
Utility / transmission owner
American Transmission Co.
Connection point (POI)
Harrison North 138kV Substation
Location
Waupaca County, Wisconsin
Technology
Battery: 2.5 MW
Total requested
2.5 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: GIA; Post GIA Status: Not Started
Queue status
Withdrawn
Entered queue
29 April 2019
Proposed online date
December 2021
Withdrawn
March 2020

Location

Marker shows the centre of Waupaca County; the queue data does not give exact sites.

Power plants in Wisconsin Β· Transmission lines in Wisconsin

Other requests in Waupaca County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem