BATTERY STORAGE Β· MISOBattery storage project J1486, Waupaca County
Battery storage project J1486, Waupaca County is a 2.5 MW battery storage request withdrawn in the MISO interconnection queue, in Waupaca County, Wisconsin, connecting to American Transmission Co..
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2019 (completed)
- Withdrawn / abandonedMar 2020 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J1486
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- American Transmission Co.
- Connection point (POI)
- Harrison North 138kV Substation
- Location
- Waupaca County, Wisconsin
- Technology
- Battery: 2.5 MW
- Total requested
- 2.5 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 29 April 2019
- Proposed online date
- December 2021
- Withdrawn
- March 2020
Location
Marker shows the centre of Waupaca County; the queue data does not give exact sites.