πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Virginia

OCTARY USA Β· INTERCONNECTION QUEUES

Interconnection queue in Virginia (2018 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown172,116 MW
Active in queue2,116 MW17 requests
Agreement signed1,607 MW12 requests
Withdrawn7911.2 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

17 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Blackwater Solar
Solar
800 MWAgreement signed Sussex, VAPJM Sep 2018target 2029
Blue Ridge Solar
Solar
150 MWAgreement signed Pittsylvania, VAPJM Aug 2018target 2028
Riverstone Solar
Solar
150 MWAgreement signed Buckingham, VAPJM Sep 2018target 2027
Maroon Solar
Solar
149 MWPaused / redesign Culpeper, VAPJM Sep 2018target 2027
CC Solar I
Solar
120 MWPaused / redesign Caroline, VAPJM Sep 2018target 2025
New Road Storage
Battery storage
120 MWAgreement signed Loudoun, VAPJM Dec 2018target 2027
Chester Solar
Solar
120 MWAgreement signed Chesterfield, VAPJM Dec 2018target 2027
Blue Jay Solar
Solar
100 MWPaused / redesign Pulaski, VAPJM Mar 2018target 2025
Bakers Pond Solar
Solar
100 MWPaused / redesign Prince George, VAPJM Sep 2018target 2026
Waller Solar I
Solar
86.0 MWAgreement signed Lancaster, VAPJM Mar 2018target 2027
Knoxville Solar
Solar
51.0 MWAgreement signed Isle Of Wight, VAPJM Mar 2018target 2027
Sunridge Solar
Solar
50.0 MWAgreement signed Rockingham, VAPJM Dec 2018target 2026
Ho-Fel Solar
Solar
40.0 MWPaused / redesign Isle Of Wight, VAPJM Sep 2018target 2026
Walnut Solar I
Solar
20.0 MWAgreement signed King And Queen, VAPJM Oct 2018target 2026
Winterpock I
Solar
20.0 MWAgreement signed Chesterfield, VAPJM Aug 2018target 2025
Walnut Solar I
Solar
20.0 MWAgreement signed King And Queen, VAPJM Jan 2018target 2026
Walnut Solar I
Solar
20.0 MWAgreement signed King And Queen, VAPJM Apr 2018target 2026

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)