Waller Solar I

Waller Solar I is a 86.0 MW solar request with a signed interconnection agreement in the PJM interconnection queue, in Lancaster County, Virginia, connecting to Dominion.

Queue statusConsented
  1. PlanningQueued Mar 2018 (completed)
  2. Consented (current stage)
  3. Construction (not yet reached)
  4. OperatingTarget Dec 2027 (not yet reached)
  5. Closed (not yet reached)

Request details

Queue ID
AD2-074
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
Dominion
Connection point (POI)
Garner DP-Lancaster 115 kV
Location
Lancaster County, Virginia
Technology
Solar: 86.0 MW
Total requested
86.0 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
Queue status
Active
Entered queue
15 March 2018
Proposed online date
December 2027

Location

Marker shows the centre of Lancaster County; the queue data does not give exact sites.

Power plants in Virginia · Transmission lines in Virginia

Other requests in Lancaster County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem