United States β€Ί Grid β€Ί Interconnection queues β€Ί Virginia

BATTERY STORAGE Β· PJM

Battery storage project AG2-366, Lancaster County

Battery storage project AG2-366, Lancaster County is a 50.0 MW battery storage request withdrawn in the PJM interconnection queue, in Lancaster County, Virginia, connecting to Dominion.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2025 (completed)
  2. Withdrawn / abandonedNov 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AG2-366
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
Dominion
Developer
Virginia Electric and Power Company
Connection point (POI)
Garner Delivery Point - Lancaster 115 kV
Location
Lancaster County, Virginia
Technology
Battery: 50.0 MW
Total requested
50.0 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
20 February 2025
Proposed online date
December 2025
Withdrawn
November 2025

Location

Marker shows the centre of Lancaster County; the queue data does not give exact sites.

Power plants in Virginia Β· Transmission lines in Virginia

Other requests in Lancaster County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem