United States βΊ Grid βΊ Interconnection queues βΊ Virginia
SOLAR Β· PJMSolar project AC1-142, Lancaster County
Solar project AC1-142, Lancaster County is a 100 MW solar request withdrawn in the PJM interconnection queue, in Lancaster County, Virginia, connecting to Dominion.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2016 (completed)
- Withdrawn / abandonedJun 2017 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AC1-142
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- Dominion
- Connection point (POI)
- Garner-Lancaster 115kV
- Location
- Lancaster County, Virginia
- Technology
- Solar: 100 MW
- Total requested
- 100 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 28 October 2016
- Proposed online date
- December 2019
- Withdrawn
- June 2017
Location
Marker shows the centre of Lancaster County; the queue data does not give exact sites.
Other requests in Lancaster County
- Waller Solar ISolar Β· 86.0 MW Β· agreement signed
- Waller Solar ISolar Β· 45.0 MW Β· agreement signed
- Waller Solar ISolar Β· 45.0 MW Β· agreement signed
- Battery storage project AI2-278, Lancaster CountyBattery storage Β· 30.0 MW Β· in study
- Merry Point SolarSolar Β· 70.0 MW Β· withdrawn
- Battery storage project AG2-366, Lancaster CountyBattery storage Β· 50.0 MW Β· withdrawn
- Solar project AF2-362, Lancaster CountySolar Β· 50.0 MW Β· withdrawn
- Merry Point SolarSolar Β· 30.0 MW Β· withdrawn
- Solar project AG2-005, Lancaster CountySolar Β· 20.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem