United States › Grid › Interconnection queues › Virginia
BATTERY STORAGE · PJMBattery storage project AI2-278, Lancaster County
Battery storage project AI2-278, Lancaster County is a 30.0 MW battery storage request in interconnection study in the PJM interconnection queue, in Lancaster County, Virginia, connecting to Dominion.
- PlanningQueued Mar 2023 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2027 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- AI2-278
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- Dominion
- Connection point (POI)
- Garner Delivery Point - Lancaster 115 kV
- Location
- Lancaster County, Virginia
- Technology
- Battery: 30.0 MW
- Total requested
- 30.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Active
- Entered queue
- 2 March 2023
- Proposed online date
- December 2027
Location
Marker shows the centre of Lancaster County; the queue data does not give exact sites.
Other requests in Lancaster County
- Waller Solar ISolar · 86.0 MW · agreement signed
- Waller Solar ISolar · 45.0 MW · agreement signed
- Waller Solar ISolar · 45.0 MW · agreement signed
- Solar project AC1-142, Lancaster CountySolar · 100 MW · withdrawn
- Merry Point SolarSolar · 70.0 MW · withdrawn
- Battery storage project AG2-366, Lancaster CountyBattery storage · 50.0 MW · withdrawn
- Solar project AF2-362, Lancaster CountySolar · 50.0 MW · withdrawn
- Merry Point SolarSolar · 30.0 MW · withdrawn
- Solar project AG2-005, Lancaster CountySolar · 20.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem