United States βΊ Grid βΊ Interconnection queues βΊ Texas
OCTARY USA Β· INTERCONNECTION QUEUESInterconnection queue in Texas (2015 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Eagle Pines Gas Gas Β· FGE Power |
1,174 MW | In study |
| Priddy Wind Onshore wind Β· ENGIE North America |
302 MW | Agreement signed |
| Big Sampson Wind Onshore wind Β· Big Sampson Wind Project, LLC |
265 MW | Agreement signed |
| Morada Del Sol Solar Solar Β· First Solar |
245 MW | Paused / redesign |
| Coyote Wind Onshore wind Β· Coyote Wind |
243 MW | Agreement signed |
| Grandview 4 Phase A Wind Onshore wind |
201 MW | Paused / redesign |
| Loma Pinta Wind Onshore wind Β· Enerverse |
197 MW | Agreement signed |
| Whatley Solar Solar Β· Invenergy |
150 MW | Paused / redesign |
| Wake Solar Solar Β· Invenergy |
150 MW | Paused / redesign |
| Solar project J483, Liberty County Solar |
100 MW | Agreement signed |
| Owego Solar Solar Β· Hecate Energy |
74.0 MW | Paused / redesign |
| Chatee Solar Solar Β· Hecate Energy |
57.0 MW | Paused / redesign |
| Hecate Solar Solar Β· Hecate Energy |
33.0 MW | Paused / redesign |
| Mirage Gas |
11.0 MW | Paused / redesign |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)