United States βΊ Grid βΊ Interconnection queues βΊ Ohio
OCTARY USA Β· INTERCONNECTION QUEUESInterconnection queue in Ohio (2018 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Cadence Solar Energy Center Solar |
240 MW | Agreement signed |
| Fountain Point Solar Solar Β· Fountain Point Solar Energy LLC |
207 MW | In study |
| Harvey Solar I Solar |
150 MW | Agreement signed |
| Grover Hill Wind Project Onshore wind |
140 MW | Agreement signed |
| Border Basin Solar |
120 MW | Agreement signed |
| Strawhat Solar Energy Center Solar |
110 MW | Paused / redesign |
| Hardin Energy Center βΓΓ¬ Storage I Battery storage |
50.0 MW | Paused / redesign |
| Cadence Energy Storage Battery storage |
50.0 MW | Paused / redesign |
| Recreation Solar Solar |
49.5 MW | Paused / redesign |
| Vinton Energy Storage Battery storage |
42.0 MW | Paused / redesign |
| Blue Creek Wind Farm Solar |
26.0 MW | Paused / redesign |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)