United States β€Ί Grid β€Ί Interconnection queues β€Ί Ohio

OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in Ohio (2015 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown121,581 MW
Active in queue940 MW1 requests
Agreement signed940 MW1 requests
Withdrawn121,581 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

12 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Cedar Point Energy Center
Gas
955 MWWithdrawn / abandoned Lucas, OHPJM Oct 2015target 2024
Onshore wind project AA2-075, Van Wert County
Onshore wind
250 MWWithdrawn / abandoned Van Wert, OHPJM Mar 2015target 2022
Onshore wind project AB2-016, Van Wert County
Onshore wind
100 MWWithdrawn / abandoned Van Wert, OHPJM Dec 2015target 2019
Solar project AB1-136, Franklin County
Solar
80.0 MWWithdrawn / abandoned Franklin, OHPJM Oct 2015target 2016
Solar project AA2-151, Ross County
Solar
80.0 MWWithdrawn / abandoned Ross, OHPJM Apr 2015target 2016
Battery storage project AB1-167, Noble County
Battery storage
50.0 MWWithdrawn / abandoned Noble, OHPJM Oct 2015target 2017
Battery storage project AA2-186, Hardin County
Battery storage
20.0 MWWithdrawn / abandoned Hardin, OHPJM Apr 2015target 2016
Gas project AB1-178, Columbiana County
Gas
19.9 MWWithdrawn / abandoned Columbiana, OHPJM Oct 2015target 2017
Solar project AB1-158, Perry County
Solar
10.0 MWWithdrawn / abandoned Perry, OHPJM Oct 2015target 2017
Thornville 12kV
Solar
10.0 MWWithdrawn / abandoned Perry, OHPJM Oct 2015target 2018
Solar project AB1-032, Athens County
Solar
3.3 MWWithdrawn / abandoned Athens, OHPJM Jul 2015target 2016
Lake County Generating Station
Other
3.1 MWWithdrawn / abandoned Lake, OHPJM Oct 2015target 2017

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)