United States βΊ Grid βΊ Interconnection queues βΊ Ohio
GAS Β· PJMCedar Point Energy Center
Cedar Point Energy Center is a 955 MW gas request withdrawn in the PJM interconnection queue, in Lucas County, Ohio, connecting to ATSI.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2015 (completed)
- Withdrawn / abandonedSep 2023 (project stopped here)
- ConsentedNov 2019 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AB1-107
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- ATSI
- Connection point (POI)
- Bayshore-GM Powertrain 138 kV & Lallendorf 345kV
- Location
- Lucas County, Ohio
- Technology
- Gas: 955 MW
- Total requested
- 955 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
- Queue status
- Withdrawn
- Entered queue
- 22 October 2015
- Agreement signed
- 25 November 2019
- Proposed online date
- November 2024
- Withdrawn
- September 2023
Location
Marker shows the centre of Lucas County; the queue data does not give exact sites.
Other requests in Lucas County
- Gas project H037, Lucas CountyGas Β· 135 MW Β· agreement signed
- Oregon Energy CenterGas Β· 799 MW Β· built
- Oregon Energy CenterGas Β· 161 MW Β· built
- Gas project AH1-690, Lucas CountyGas Β· 1,475 MW Β· withdrawn
- Gas project Z1-030, Lucas CountyGas Β· 464 MW Β· withdrawn
- Battery storage project AG1-199, Lucas CountyBattery storage Β· 300 MW Β· withdrawn
- Gas project H023, Lucas CountyGas Β· 135 MW Β· withdrawn
- FDS Coke PlantOther Β· 135 MW Β· withdrawn
- Battery storage project AG2-223, Lucas CountyBattery storage Β· 100 MW Β· withdrawn
- Solar project AG2-515, Lucas CountySolar Β· 100 MW Β· withdrawn
- Onshore wind project G754, Lucas CountyOnshore wind Β· 50.0 MW Β· withdrawn
- Solar project Y2-091, Lucas CountySolar Β· 0.3 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem