United States βΊ Grid βΊ Interconnection queues βΊ Ohio
ONSHORE WIND Β· MISOOnshore wind project G754, Lucas County
Onshore wind project G754, Lucas County is a 50.0 MW onshore wind request withdrawn in the MISO interconnection queue, in Lucas County, Ohio.
Queue statusWithdrawn / abandoned
- PlanningQueued Feb 2007 (completed)
- Withdrawn / abandonedDec 2008 (project stopped here)
- ConsentedDec 2008 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- G754
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- 138 kV transmission line that serves City of Toledo pump station
- Location
- Lucas County, Ohio
- Technology
- Wind: 50.0 MW
- Total requested
- 50.0 MW
- Study phase
- Network Upgrade
- Queue status
- Withdrawn
- Entered queue
- 28 February 2007
- Agreement signed
- 8 December 2008
- Proposed online date
- November 2008
- Withdrawn
- December 2008
Location
Marker shows the centre of Lucas County; the queue data does not give exact sites.
Other requests in Lucas County
- Gas project H037, Lucas CountyGas Β· 135 MW Β· agreement signed
- Oregon Energy CenterGas Β· 799 MW Β· built
- Oregon Energy CenterGas Β· 161 MW Β· built
- Gas project AH1-690, Lucas CountyGas Β· 1,475 MW Β· withdrawn
- Cedar Point Energy CenterGas Β· 955 MW Β· withdrawn
- Gas project Z1-030, Lucas CountyGas Β· 464 MW Β· withdrawn
- Battery storage project AG1-199, Lucas CountyBattery storage Β· 300 MW Β· withdrawn
- Gas project H023, Lucas CountyGas Β· 135 MW Β· withdrawn
- FDS Coke PlantOther Β· 135 MW Β· withdrawn
- Battery storage project AG2-223, Lucas CountyBattery storage Β· 100 MW Β· withdrawn
- Solar project AG2-515, Lucas CountySolar Β· 100 MW Β· withdrawn
- Solar project Y2-091, Lucas CountySolar Β· 0.3 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem