United States βΊ Grid βΊ Interconnection queues βΊ Ohio
SOLAR Β· PJMSolar project AB1-158, Perry County
Solar project AB1-158, Perry County is a 10.0 MW solar request withdrawn in the PJM interconnection queue, in Perry County, Ohio, connecting to AEP.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2015 (completed)
- Withdrawn / abandonedNov 2015 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AB1-158
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- AEP
- Connection point (POI)
- Thornville 34.5kV
- Location
- Perry County, Ohio
- Technology
- Solar: 10.0 MW
- Total requested
- 10.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 30 October 2015
- Proposed online date
- October 2017
- Withdrawn
- November 2015
Location
Marker shows the centre of Perry County; the queue data does not give exact sites.
Other requests in Perry County