United States βΊ Grid βΊ Interconnection queues βΊ Ohio
SOLAR Β· PJMThornville 12kV
Thornville 12kV is a 10.0 MW solar request withdrawn in the PJM interconnection queue, in Perry County, Ohio, connecting to AEP.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2015 (completed)
- Withdrawn / abandonedFeb 2018 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AB1-174
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- AEP
- Connection point (POI)
- Thornville12kV
- Location
- Perry County, Ohio
- Technology
- Solar: 10.0 MW
- Total requested
- 10.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Wholesale Market P
- Queue status
- Withdrawn
- Entered queue
- 30 October 2015
- Proposed online date
- December 2018
- Withdrawn
- February 2018
Location
Marker shows the centre of Perry County; the queue data does not give exact sites.
Other requests in Perry County
- Solar project AH2-169, Perry CountySolar Β· 80.0 MW Β· in study
- Suburban LFOther Β· 6.4 MW Β· built
- Solar project AB1-158, Perry CountySolar Β· 10.0 MW Β· withdrawn
- Other project T101, Perry CountyOther Β· 6.4 MW Β· withdrawn
- Solar + storage project AH2-174, Perry CountySolar + storage Β· 2.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem