United States βΊ Grid βΊ Interconnection queues βΊ Ohio
BATTERY STORAGE Β· PJMBattery storage project AB1-167, Noble County
Battery storage project AB1-167, Noble County is a 50.0 MW battery storage request withdrawn in the PJM interconnection queue, in Noble County, Ohio, connecting to AEP.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2015 (completed)
- Withdrawn / abandonedNov 2017 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AB1-167
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- AEP
- Connection point (POI)
- South Cumberland 69kV
- Location
- Noble County, Ohio
- Technology
- Battery: 50.0 MW
- Total requested
- 50.0 MW
- Service type
- Energy only (ERIS)
- Study phase
- Available studies: Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 30 October 2015
- Proposed online date
- August 2017
- Withdrawn
- November 2017
Location
Marker shows the centre of Noble County; the queue data does not give exact sites.