United States βΊ Grid βΊ Interconnection queues βΊ Ohio
OCTARY USA Β· INTERCONNECTION QUEUESWithdrawn queue requests in Ohio (2012 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Gas project Y2-085, Carroll County Gas |
1,050 MW | Withdrawn / abandoned |
| Gas project Y1-036, Lake County Gas |
462 MW | Withdrawn / abandoned |
| Gas project Y1-035, Lake County Gas |
462 MW | Withdrawn / abandoned |
| Onshore wind project Y1-030, Wyandot County Onshore wind |
100 MW | Withdrawn / abandoned |
| Gas project Y2-053, Wood County Gas |
35.0 MW | Withdrawn / abandoned |
| Solar project Y1-023 Solar |
20.0 MW | Withdrawn / abandoned |
| Solar project Y1-074, Summit County Solar |
7.8 MW | Withdrawn / abandoned |
| Berkshire 3.4kV Battery storage |
4.0 MW | Withdrawn / abandoned |
| Solar project Y1-024 Solar |
3.0 MW | Withdrawn / abandoned |
| Other project Y2-057, Wyandot County Other |
3.0 MW | Withdrawn / abandoned |
| Solar project Y2-091, Lucas County Solar |
0.3 MW | Withdrawn / abandoned |
| Solar project Y2-092, Wood County Solar |
0.3 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)