United States βΊ Grid βΊ Interconnection queues βΊ Ohio
SOLAR Β· PJMSolar project Y2-092, Wood County
Solar project Y2-092, Wood County is a 0.3 MW solar request withdrawn in the PJM interconnection queue, in Wood County, Ohio, connecting to ATSI.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2012 (completed)
- Withdrawn / abandonedJan 2014 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- Y2-092
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- ATSI
- Connection point (POI)
- Walbridge Solar
- Location
- Wood County, Ohio
- Technology
- Solar: 0.3 MW
- Total requested
- 0.3 MW
- Service type
- Energy only (ERIS)
- Study phase
- Interim/Interconnection Service Agreement: Withdrawn
- Queue status
- Withdrawn
- Entered queue
- 31 October 2012
- Withdrawn
- January 2014
Location
Marker shows the centre of Wood County; the queue data does not give exact sites.
Other requests in Wood County
- Juliet EnergySolar Β· 50.0 MW Β· agreement signed
- Juliet EnergySolar Β· 12.0 MW Β· agreement signed
- Gas project AH1-711, Wood CountyGas Β· 408 MW Β· in study
- Solar project AH2-068, Wood CountySolar Β· 100 MW Β· in study
- Solar project AI2-164, Wood CountySolar Β· 72.0 MW Β· in study
- Solar + storage project AH2-408, Wood CountySolar + storage Β· 49.9 MW Β· in study
- Solar + storage project AH2-409, Wood CountySolar + storage Β· 30.1 MW Β· in study
- Troy EnergyGas Β· 60.0 MW Β· built
- Troy EnergyGas Β· 40.0 MW Β· built
- Gas project AE1-119, Wood CountyGas Β· 550 MW Β· withdrawn
- Solar project AG2-470, Wood CountySolar Β· 300 MW Β· withdrawn
- Troy Battery StorageBattery storage Β· 250 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem