United States › Grid › Interconnection queues › Ohio
SOLAR · PJMJuliet Energy
Juliet Energy is a 50.0 MW solar request with a signed interconnection agreement in the PJM interconnection queue, in Wood County, Ohio, connecting to ATSI.
Queue statusConsented
- PlanningQueued Jul 2019 (completed)
- Consented (current stage)
- Construction (not yet reached)
- OperatingTarget May 2026 (not yet reached)
- Closed (not yet reached)
Request details
- Queue ID
- AF1-064
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- ATSI
- Connection point (POI)
- Weston 69 kV
- Location
- Wood County, Ohio
- Technology
- Solar: 50.0 MW
- Total requested
- 50.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
- Queue status
- Active
- Entered queue
- 31 July 2019
- Proposed online date
- May 2026
Location
Marker shows the centre of Wood County; the queue data does not give exact sites.
Other requests in Wood County
- Juliet EnergySolar · 12.0 MW · agreement signed
- Gas project AH1-711, Wood CountyGas · 408 MW · in study
- Solar project AH2-068, Wood CountySolar · 100 MW · in study
- Solar project AI2-164, Wood CountySolar · 72.0 MW · in study
- Solar + storage project AH2-408, Wood CountySolar + storage · 49.9 MW · in study
- Solar + storage project AH2-409, Wood CountySolar + storage · 30.1 MW · in study
- Troy EnergyGas · 60.0 MW · built
- Troy EnergyGas · 40.0 MW · built
- Gas project AE1-119, Wood CountyGas · 550 MW · withdrawn
- Solar project AG2-470, Wood CountySolar · 300 MW · withdrawn
- Troy Battery StorageBattery storage · 250 MW · withdrawn
- Solar project AG2-195, Wood CountySolar · 53.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem