GAS Β· PJM

Troy Energy

Troy Energy is a 40.0 MW gas request built and operating in the PJM interconnection queue, in Wood County, Ohio, connecting to ATSI.

Queue statusOperating
  1. PlanningQueued Apr 2010 (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingApr 2014 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
W1-072A_AT5
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
ATSI
Connection point (POI)
Lemoyne
Location
Wood County, Ohio
Technology
Gas: 40.0 MW
Total requested
40.0 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
Queue status
Operational
Entered queue
26 April 2010
Proposed online date
June 2011
Came online
April 2014

Location

Marker shows the centre of Wood County; the queue data does not give exact sites.

Power plants in Ohio Β· Transmission lines in Ohio

Other requests in Wood County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem