United States βΊ Grid βΊ Interconnection queues βΊ Ohio
GAS Β· PJMTroy Energy
Troy Energy is a 40.0 MW gas request built and operating in the PJM interconnection queue, in Wood County, Ohio, connecting to ATSI.
Request details
- Queue ID
- W1-072A_AT5
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- ATSI
- Connection point (POI)
- Lemoyne
- Location
- Wood County, Ohio
- Technology
- Gas: 40.0 MW
- Total requested
- 40.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
- Queue status
- Operational
- Entered queue
- 26 April 2010
- Proposed online date
- June 2011
- Came online
- April 2014
Location
Marker shows the centre of Wood County; the queue data does not give exact sites.
Other requests in Wood County
- Juliet EnergySolar Β· 50.0 MW Β· agreement signed
- Juliet EnergySolar Β· 12.0 MW Β· agreement signed
- Gas project AH1-711, Wood CountyGas Β· 408 MW Β· in study
- Solar project AH2-068, Wood CountySolar Β· 100 MW Β· in study
- Solar project AI2-164, Wood CountySolar Β· 72.0 MW Β· in study
- Solar + storage project AH2-408, Wood CountySolar + storage Β· 49.9 MW Β· in study
- Solar + storage project AH2-409, Wood CountySolar + storage Β· 30.1 MW Β· in study
- Troy EnergyGas Β· 60.0 MW Β· built
- Gas project AE1-119, Wood CountyGas Β· 550 MW Β· withdrawn
- Solar project AG2-470, Wood CountySolar Β· 300 MW Β· withdrawn
- Troy Battery StorageBattery storage Β· 250 MW Β· withdrawn
- Solar project AG2-195, Wood CountySolar Β· 53.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem