United States βΊ Grid βΊ Interconnection queues βΊ Ohio
GAS Β· PJMGas project Y2-085, Carroll County
Gas project Y2-085, Carroll County is a 1,050 MW gas request withdrawn in the PJM interconnection queue, in Carroll County, Ohio, connecting to ATSI.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2012 (completed)
- Withdrawn / abandonedJul 2013 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- Y2-085
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- ATSI
- Connection point (POI)
- SammisβΓΓ¬Star 345kV
- Location
- Carroll County, Ohio
- Technology
- Gas: 1,050 MW
- Total requested
- 1,050 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 30 October 2012
- Proposed online date
- January 2017
- Withdrawn
- July 2013
Location
Marker shows the centre of Carroll County; the queue data does not give exact sites.
Other requests in Carroll County
- Gas project AH1-680, Carroll CountyGas Β· 1,300 MW Β· in study
- Carroll County Energy LLCGas Β· 742 MW Β· built
- Carroll County Energy LLCGas Β· 20.0 MW Β· built
- Solar project AH2-275, Carroll CountySolar Β· 100 MW Β· withdrawn
- Solar project AH1-551, Carroll CountySolar Β· 100 MW Β· withdrawn
- Echelon SolarSolar + storage Β· 80.0 MW Β· withdrawn
- Solar project AH1-236, Carroll CountySolar Β· 8.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem