United States βΊ Grid βΊ Interconnection queues βΊ Ohio
SOLAR Β· PJMSolar project AH2-275, Carroll County
Solar project AH2-275, Carroll County is a 100 MW solar request withdrawn in the PJM interconnection queue, in Carroll County, Ohio, connecting to ATSI.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2022 (completed)
- Withdrawn / abandonedJan 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AH2-275
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- ATSI
- Connection point (POI)
- Carrollton Solar 138 kV
- Location
- Carroll County, Ohio
- Technology
- Solar: 100 MW
- Total requested
- 100 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 10 March 2022
- Proposed online date
- March 2023
- Withdrawn
- January 2025
Location
Marker shows the centre of Carroll County; the queue data does not give exact sites.
Other requests in Carroll County
- Gas project AH1-680, Carroll CountyGas Β· 1,300 MW Β· in study
- Carroll County Energy LLCGas Β· 742 MW Β· built
- Carroll County Energy LLCGas Β· 20.0 MW Β· built
- Gas project Y2-085, Carroll CountyGas Β· 1,050 MW Β· withdrawn
- Solar project AH1-551, Carroll CountySolar Β· 100 MW Β· withdrawn
- Echelon SolarSolar + storage Β· 80.0 MW Β· withdrawn
- Solar project AH1-236, Carroll CountySolar Β· 8.0 MW Β· withdrawn