Other project Y2-057, Wyandot County

Other project Y2-057, Wyandot County is a 3.0 MW other request withdrawn in the PJM interconnection queue, in Wyandot County, Ohio, connecting to AEP.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2012 (completed)
  2. Withdrawn / abandonedSep 2012 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
Y2-057
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
AEP
Connection point (POI)
Wyandot 13kV
Location
Wyandot County, Ohio
Technology
Other: 3.0 MW
Total requested
3.0 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
23 August 2012
Proposed online date
October 2013
Withdrawn
September 2012

Location

Marker shows the centre of Wyandot County; the queue data does not give exact sites.

Power plants in Ohio Β· Transmission lines in Ohio

Other requests in Wyandot County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem