Solar project Y1-023

Solar project Y1-023 is a 20.0 MW solar request withdrawn in the PJM interconnection queue, connecting to Duke.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2012 (completed)
  2. Withdrawn / abandonedOct 2012 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
Y1-023
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
Duke
Connection point (POI)
Felicity 69kV
Location
Ohio
Technology
Solar: 20.0 MW
Total requested
20.0 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study
Queue status
Withdrawn
Entered queue
28 February 2012
Proposed online date
October 2013
Withdrawn
October 2012

Location

No county location in the queue data.