Completed queue projects in New Hampshire

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown211,712 MW
Active in queue125 MW3 requests
Agreement signed25.0 MW2 requests
Withdrawn815,904 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

21 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Seabrook Power Uprate7
Nuclear
1,265 MWOperating Rockingham, NHISO-NE Jan 2003target 2006
Granite Reliable Power
Onshore wind
94.5 MWOperating Coos, NHISO-NE Aug 2006target 2012
Burgess BioPower
Other
58.7 MWOperating Coos, NHISO-NE Feb 2008target 2014
Groton Wind Farm
Onshore wind
48.0 MWOperating Grafton, NHISO-NE Sep 2010target 2012
GRE Capacity Uprate
Gas
41.0 MWOperating Rockingham, NHISO-NE Nov 2014target 2017
Antrim Wind
Onshore wind
28.4 MWOperating Hillsborough, NHISO-NE Mar 2015target 2019
Newington Gas Turbine Uprate
Gas
27.9 MWOperating Rockingham, NHISO-NE Dec 2014target 2015
GLHA James River/Fraser Paper7
Hydro
25.0 MWOperating Coos, NHISO-NE Jul 2003target 2004
Lempster
Onshore wind
24.0 MWOperating Sullivan, NHISO-NE Nov 2004target 2008
EP Newington Energy Capacity Increase
Gas
21.2 MWOperating Rockingham, NHISO-NE Mar 2013target 2014
Merrimack Unit 2 Second Uprate
Coal
17.2 MWOperating Merrimack, NHISO-NE Jan 2009target 2010
Indeck Energy Alexandria
Other
16.5 MWOperating Grafton, NHISO-NE Jul 2007target 2009
Berlin Energy Uprate and Battery Addition
Other
15.0 MWOperating Coos, NHISO-NE Mar 2021target 2023
Seabrook LP Turbine Blade replacement
Nuclear
13.0 MWOperating Rockingham, NHISO-NE Oct 2008target 2012
Burgess BioPower Increase
Other
9.0 MWOperating Coos, NHISO-NE Oct 2010target 2014
Jericho Wind
Onshore wind
8.6 MWOperating Coos, NHISO-NE Apr 2013target 2016
Merrimack Unit 2 Uprate
Coal
4.7 MWOperating Merrimack, NHISO-NE Apr 2008target 2008
Moore Station Uprate
Hydro
4.6 MWOperating Grafton, NHISO-NE Apr 2016target 2023
Jericho Wind expansion
Onshore wind
3.5 MWOperating Coos, NHISO-NE Feb 2014target 2016
Hemphill Increase
Other
3.4 MWOperating Sullivan, NHISO-NE Jan 2016target 2016
Comerford Unit #1
Hydro
-17.0 MWOperating Grafton, NHISO-NE Mar 2006target 2009

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)